Thursday 3 February 2011

Pre-Production Completed

By completing all our research and planning (posted below), ATLAS media productions will be able to shoot the two minute short after our Half Term week holiday when the school will be re-open. We will post shoot by shoot; the problems experienced, how good the shoot went and any changes to the previous ideas. After completing the film, we will move onto editing all of the footage and inclusion of any sound and music, still images or special effects thus ending up with our film film.

For my Construction posts Please Visit my Film Construction Page.
For my Evaluation posts Please Visit my Film Evaluation Page.

Wednesday 2 February 2011

Possible Shooting Problems

During the filming of Catechize Acadamy our 2 minute short film, we have eliminated several problems.
Costume Changes;
During our film, we have no scheduled costume changes as we are setting the film to be on the same school day.
Travelling between Locations
Our filming location has been decided to be filmed within school, so travelling between locations will all within walking distance.
Producing same shot/angle
We are planning to film in order of location, to ensure that we are using the same shooting angle if a duplicated shot is required.
Weather Conditions
We are filming all scene's inside the school, so even though the weather may change this may just be a way of showing time past.
Changes of Natural Light
If there is a drop in natural light, we may possibly use production artificial lighting to address the drop in light. If there is a increase in natural light, then filming may have to be halted and timing schedule be changed to allow for this delay, although we can not completely eliminate this problem, as the level of natural light will change from hour to hour.